The pool of tile workers used to cancel every remaining tile after a
hardcoded 2-hour wall clock, silently truncating large batches (a
670-tile completion run lost its last 348 tiles that way). The timeout
now defaults to unlimited and can be capped per deployment with the
LIDAR_BATCH_TIMEOUT environment variable (seconds); the local worker
compose sets it to 6 hours.
💘 Generated with Crush
Assisted-by: Crush:glm-5.2